Kin thermal power station No.1 & 2 loading coal berth

Work Summary

Project Name Kin thermal power station No.1 & 2 loading coal berth
Client Okinawa Electric co.,ltd

Details

Rake Truss Barge 900 t/unit 3 units
Temporal Pile H400×400×13×21 / L=26.0~29.0m 24 piles
Mooring Dolphin Pile 10°Batter Pile / φ1,600mm×16/22mm / L=45.5~48.0m 4 piles
Piles for Belt Conveyor 10°Batter Pile / φ1,600mm×16/19mm / L=33.5~40.0m 9 piles
Rake Truss Installation 900 t/unit 3 units
Rake Truss Pile 7.1~9.5°Batter Pile / φ1,600mm×16mm / L=41.0~47.5m 42 piles
Mooring Dolphin Body 600 t/unit 1 unit
Body for Belt Conveyor 450 t/unit 3 units

 