Iwakuni Airport(13) Relocation of Runway, North Breakwater Construction
Work Summary
Project Name | Iwakuni Airport(13) Relocation of Runway, North Breakwater Construction |
---|---|
Client | Chugoku-Shikoku Defense Bureau |
Details
Steel Pipe Pile | φ1,016mm t=12mm L=37.5m | 8 piles |
---|---|---|
Steel Pipe Batter Pile | 15°Batter Pile / φ1,016mm t=17/12mm L=41.6~43.7m | 112 piles |
15°Batter Pile / φ1,200mm t=15/14mm L=42.9~43.4m | 124 piles | |
15°Batter Pile / φ1,300mm t=14mm L=44.1~44.5m | 20 piles | |
15°Batter Pile / φ1,422.4mm t=16/14mm L=40.7~41.3m | 24 piles | |
Total | 288 piles |