Yoshino River, East Circularity Bridge Tetrametric Construction
Work Summary
Project Name | Yoshino River, East Circularity Bridge Tetrametric Construction |
---|---|
Client | Tokushima Prefectural Land Management Department |
Details
Steel Pipe Sheet Pile | P6 / φ1,200mm t=14~25mm L=49.0m / Connecting Pile | 35 piles |
---|---|---|
P7 / φ1,200mm t=14~25mm L=49.5m / Connecting Pile | 35 piles | |
P8 / φ1,200mm t=14~25mm L=49.5m / Connecting Pile | 35 piles | |
Total | 105 piles |