Yoshino River, East Circularity Bridge Tetrametric Construction

Work Summary

Project Name Yoshino River, East Circularity Bridge Tetrametric Construction
Client Tokushima Prefectural Land Management Department

Details

Steel Pipe Sheet Pile P6 / φ1,200mm t=14~25mm L=49.0m / Connecting Pile 35 piles
P7 / φ1,200mm t=14~25mm L=49.5m / Connecting Pile 35 piles
P8 / φ1,200mm t=14~25mm L=49.5m / Connecting Pile 35 piles
Total 105 piles

 