Dai-Ichi-Yutaka(Rotating 1,800t)
-
Primary specification
Hull
Length 106.0 m Width 43.0 m Depth 10.0 m Loading Weight 16,000.0 ton Displacement Tonnage 27,000.0 ton Dead Draft 3.0 m Full Draft 6.8 m Ship Handling Winch
Winding Load 60 t×8 units
20 t×2 unitsWinding Speed 60 t×10 m/min
20 t×20 m/minSide Thruster
At Bow 900.0 ps At Sterm 1,800.0 ps Electric Facility
Main Generator 2,200 kW×3 units Internal Combustion 3,200 ps×3 units Sub Generator 240 kW×1 unit Internal Combustion 360 ps×1 unit Movable Generator for Construction 400 kW Crane
Max Hoisting Load 1,800.0 ton Lifting Speed 0~6.2 m/min Rotating Speed 0.3~0.8 rpm Operating Radius 28.0~80.0 m
40.0~100.0 m
(Frying jib spec)Boom Hoisting Speed When lifting 1,800 t
R=40 m~30 m
About 3 minutes at no load -
Primary specification
Hull
Length 106.0 m Width 43.0 m Depth 10.0 m Loading Weight 16,000.0 ton Displacement Tonnage 27,000.0 ton Dead Draft 3.0 m Full Draft 6.8 m Ship Handling Winch
Winding Load 60 t×8 units
20 t×2 unitsWinding Speed 60 t×10 m/min
20 t×20 m/minSide Thruster
At Bow 900.0 ps At Sterm 1,800.0 ps Electric Facility
Main Generator 2,200 kW×3 units Internal Combustion 3,200 ps×3 units Sub Generator 240 kW×1 unit Internal Combustion 360 ps×1 unit Movable Generator for Construction 400 kW Leader guided pile driving spec
Operating Radius 28.1~50.5 m(Vertical Pile) Max Diameter 2,500 mm Pile Inclination ±27° Rotating Speed 0.3~0.8 rpm Max Weight 180 t(Vertical Pile)
100 t(Batter Pile)Hammer IHC S-500、S-280、S-200、S-90、S-70 -
Primary specification
Hull
Length 106.0 m Width 43.0 m Depth 10.0 m Loading Weight 16,000.0 ton Displacement Tonnage 27,000.0 ton Dead Draft 3.0 m Full Draft 6.8 m Ship Handling Winch
Winding Load 60 t×8 units
20 t×2 unitsWinding Speed 60 t×10 m/min
20 t×20 m/minSide Thruster
At Bow 900.0 ps At Sterm 1,800.0 ps Electric Facility
Main Generator 2,200 kW×3 units Internal Combustion 3,200 ps×3 units Sub Generator 240 kW×1 units Internal Combustion 360 ps×1 units Movable Generator for Construction 400 kW Grab Bucket spec
Max Hoisting Load 300 t Operating Radius 20~60.0 m Lifting Speed 40~75 m/min Lowering Speed 55~75 m/min Max Rotating Speed 0.8 rpm Nominal Dredge Capability Light Bucket 1,550 m3/hr
Ultra Heavy Bucket 460 m3/hrBucket Capacity Light Bucket 45 m3
Ultra Heavy Bucket 20 m3
Each specification
Crane spec | Specification sheet of vessel(259KB) Hoisting Capacity 1,710 t Detail(79KB) |
---|---|
Leader guided pile driving spec | Specification sheet of vessel(294KB) |
Grab Bucket spec | Specification sheet of vessel(286KB) 45 m3 Bucket Spec(24KB) 20 m3 Bucket Spec(23KB) |
Construction Achievement
-
- Minamihonmoku -16m MC-3 Quay (Earthquake Resistance)
- Steel Cell Installation of the -16m Quay
-
- Tokyo International Airport D Runway Out of The Construction
- Pile Driving of Jacket Type Pier Structure Runway
-
- Cosmo Oil Co. Ltd.,Sakaide Oil Refinery №1 Jetty
- Jacket Structure Working Platform of Oil Shipment Pier
-
- Taiwan Electric Power Corp., Hsinta Power Plant, Contact Jetty
- Power Plant Coal Pier in Taiwan, Bridge Construction
-
- Sakhalin Ⅰ Oruran P/F Pipeline
- Oil, Gas Pipeline Connection of Sakhalin Ⅰ
-
- Sakhalin Ⅱ TLU Installation
- Oil Shipment of Sakhalin Ⅱ, Mooring Setting
-
- Trans Tokyo Bay Highway Project Kawasaki manmade island east Jacket intallation
- Installation of Jacket (from 200 ton to 900 ton)
-
- Misaki town, Tanagawa soil unloading jetty
- Installation of Jacket (from 200 ton to 900 ton)
-
- Kin thermal power station No.1 & 2 loading coal berth
- Installation of Jacket (from 200 ton to 900 ton)
pile Driving Free Driving of Jack
-
- Saigo port, -7.5m earthquake proof quay
- Installation of Jacket (from 200 ton to 900 ton)
pile Driving Free Driving of Jack
-
- Mizushima LNG, No.6 jetty
- Installation of Jacket (from 200 ton to 900 ton)
pile Driving Free Driving of Jack
-
- Nagoya port, Tobishima south jetty(-16m)
- Installation of Jacket (from 200 ton to 900 ton)
pile Driving Free Driving of Jack
-
- Akashi strait 4A cable anchor frame
- Anchor Frame from 280 ton to 1,000 ton
-
- Kurushima strait 4A cable anchor frame
- Anchor Frame from 280 ton to 1,000 ton
-
- Suruga Shore, Offshore breakwater
- New type of Offshore breakwater
-
- Sakharin Ⅱ W.F.M.・P.G.M. transportation installation
- Module for oil platform
-
- Trans Tokyo Bay Highway Project Kawasaki manmade island east
- Pile Driving Free Driving of Jack
-
- Nagoya Port West 5th Pier Reinforcement
- Pile Drive Large Diameter Pile (Free Hanging)
-
- Hiroshima Port, Ujina Areal jetty -6.0m
- Pile Drive Batter Pile (Free Hanging)
-
- Kobe Port, Port Island No.2 quay
- Pile Drive Batter Pile (Free Hanging)
-
- Maizuru Power Plant, road for substructure
- Pile Driving sheet Pile and Under water by Hydraulic Hammer
-
- Osaka Port, Central Pier, Venitilation(No.3)
- Pile Driving sheet Pile and Under water by Hydraulic Hammer
-
- Ishikari Bay New Port -14.0m quay
- Pile Drive Driving Steel Pipe Pile (Free Hanging)
-
- Osaka Gas Corp Senboku No.2 Factory LNG No.2 Tanker Berth
- Pile Driving by Tanker Berth
-
- Kashima Port, Liquefied Gas Storag
- Pile Driving by Tanker Berth
-
- Chubu Electric Power Corporation, Kawagoe Heat Plant, LNG Loading Jett
- Pile Driving by Tanker Berth
-
- Tokyo Gas Corporation, Ogishima factory, New Jetty
- Pile Driving by Tanker Berth
-
- Sakai LNG Jetty
- Pile Driving by Tanker Berth
-
- Yokohama Port, Kanagawa Area, Improvement of Quay (-7.5m)
- Pile Drive Driving Steel Pipe Sheet Pile for Quay
-
- Chugoku Electric Power Corp, Quay of Misumi Power Plant
- Pile Driving into the fill of Steel Sheet Plate
-
- Kobe Port, Rokko Island Recovery of Quay(-13m)
- Batter Pile driving for recovery of quay
-
- Port Island, No.2 West Revetment Work (Second)
- Excavation by 45 m3 bucket
-
- Trans Tokyo Bay Highway Project, Kawasaki Manmade Island Internal Excavation
- -70m Excavation by 45 m3 Bucket
-
- Kobe Port, Rokko Island (-12m) Quay Disaster Relief Work
- Landfill Disposal By 45 m3 Bucket