Dai-Ni-Yutaka(Rotating 310t)
Primary specification
Hull
Length | 67.5 m | Width | 22.0 m | Depth | 4.0 m |
---|---|---|---|---|---|
Dead Draft | 1.64 m | Full Draft | 3.00 m | Displacement Tonnage | 2,004.0 ton |
Loading Weight | 1,900.0 ton | Loading Soil Weight | 0 m3 |
Crane
Max Hoisting Load | 310.0 ton | Operating Radius | Max 60.0 m |
---|---|---|---|
Lifting Speed | 100 m/min | Lowering Speed | 100 m/min |
Boom Hoisting Speed | 75 m/min×2 | Rotating Speed | 1.8 rpm |
Engine Output (Crane) | 1,066 kW |
Ship Handling Winch
Winding Load | 10 t×4 units 5 t×4 units 6.5 t×1 units |
Winding Speed | 10 t×10 m/min 5 t×20 m/min 6.5 t×12 m/min |
---|
Electric Facility
Main Generator | 300 KVA×1 units | Internal Combustion | 270 ps×1 units |
---|---|---|---|
Sub Generator | 125 KVA×1 units | Internal Combustion | 78 ps×1 units |
Each specification
Crane spec | Specification sheet of vessel(713KB) |
---|---|
Bucket spec | Hydraulic Bucket specification(54KB) |
Construction Achievement
-
- Tokyo International Airport D Runway Out of The Construction 【Jetty Ⅱ Area】
- Pile Driving of Jacket Type Pier Structure Runway
-
- Sakhalin Ⅱ Purigorodonoe Jetty
- LNG Gas Shipment Pier Construction of Sakhalin Ⅱ
-
- Iwakuni Airport(13) Relocation of Runway, North Breakwater Construction
- Pile Drive Batter Pile (Free Hanging)
-
- JFE Steel, EB Berth, quakeproof Construction
- Pile Drive Batter Pile (Free Hanging)
-
- Tomakomai East Port,Center Pier -14.0m quay
- Pile Drive Driving Steel Pipe Pile (Free Hanging)
-
- Yoshino River, East Circularity Bridge Tetrametric Construction
- Pile Drive Driving Steel Pipe Pile (Free Hanging)