Numajima Fishing Port Floating Pier Renovation Work




Construction Overview
- Project name
- Numashima fishing port floating pier repair work
- Orderer
- Hyogo Prefecture Awaji Prefectural Bureau
Structure Specifications and Quantity
- Sand replacement work
- V=50.0 m3 (all casing method)
- Steel pipe pile work
- φ900mm L=21.5m 2 pieces, φ800mm L=27.0m 1 piece, φ800mm L=27.0m 1 piece