Kin Fire Power Plant Units 1 & 2 New Construction Work including Coal Hoist Berth
Construction Overview
- Project name
- Kin Thermal Power Station Units 1 and 2 new construction work, coal unloading berth and other works
- Orderer
- Okinawa Electric Power Co., Ltd.
Structure Specifications and Quantity
- Equipped with diagonal truss barge
- 900 t/unit 3 units
- Temporary pile driving
- H400×400×13×21 / L=26.0~29.0m 24 pieces
- Rope control dolphin pile driving
- 10° diagonal pile / φ1,600mm×16/22mm / L=45.5~48.0m 4 pieces
- Belcon pier pile driving
- 10° diagonal pile / φ1,600mm×16/19mm / L=33.5~40.0m 9 pieces
- Diagonal truss installation
- 900 t/unit 3 units
- Diagonal truss pile driving
- 7.1~9.5° diagonal pile / φ1,600mm×16mm / L=41.0~47.5m 42 pieces
- Installation of rope dolphin frame
- 600 t/unit 1 unit
- Belcon pier structure installation
- 450 t/unit 3 units