Construction Overview


Project name
Inner main construction of Chugoku Electric Power Co., Ltd. Misumi Power Station coal unloading quay (superstructure) construction

Client
Chugoku Electric Power Co., Ltd.

Structure Specifications and Quantity


Steel pipe pile (straight pile)
φ600mm t=12mm / L=38.5~48.5m 40 pieces
φ700mm t=12mm / L=42.0~44.5m 11 pieces
φ800mm t =12mm / L=38.0~41.0m 12 pieces
φ900mm t=12mm / L=37.5~47.5m 17 pieces
φ1,000mm t=16mm / L=29.0~63.0m 300 pieces
φ1, 200mm t=19mm / L=31.0~60.0m 75 pieces

Total
455 pieces