Iwakuni Airfield (13) Runway Relocation North Breakwater Work

森長組
森長組
森長組
森長組

Construction Overview


Project name
Iwakuni Air Base (13) runway relocation and north breakwater construction

Client
Hiroshima Defense Facilities Bureau

Structure Specifications and Quantity


Steel pipe straight pile
φ1,016mm t=12mm L=37.5m 8 pieces

Steel pipe diagonal pile
15° diagonal pile / φ1,016mm t=17/12mm L=41.6~43.7m 112 pieces
15° diagonal pile / φ1,200mm t=15/14mm L=42.9~43.4m 124 pieces
15° slanted pile / φ1,300mm t=14mm L=44.1~44.5m 20 pieces
15° slanted pile / φ1,422.4mm t=16/14mm L=40.7 ~41.3m 24 pieces

Total
288 pieces