Kin Fire Power Plant Units 1 & 2 New Construction Work including Coal Hoist Berth

森長組
森長組
森長組
森長組

Construction Overview


Project name
Kin Thermal Power Station Units 1 and 2 new construction work, coal unloading berth and other works

Orderer
Okinawa Electric Power Co., Ltd.

Structure Specifications and Quantity


Equipped with diagonal truss barge
900 t/unit 3 units

Temporary pile driving
H400×400×13×21 / L=26.0~29.0m 24 pieces

Rope control dolphin pile driving
10° diagonal pile / φ1,600mm×16/22mm / L=45.5~48.0m 4 pieces

Belcon pier pile driving
10° diagonal pile / φ1,600mm×16/19mm / L=33.5~40.0m 9 pieces

Diagonal truss installation
900 t/unit 3 units

Diagonal truss pile driving
7.1~9.5° diagonal pile / φ1,600mm×16mm / L=41.0~47.5m 42 pieces

Installation of rope dolphin frame
600 t/unit 1 unit

Belcon pier structure installation
450 t/unit 3 units