Nagoya Port Tobishima Pier South Quay Wall (-16m) Main Body Fabrication and Installation Work
Construction Overview
- Project name
- Nagoya Port Tobishima Pier south quay (-16m) main body fabrication and installation work
- Orderer
- Ministry of Land, Infrastructure, Transport and Tourism Chubu Regional Development Bureau
Structure Specifications and Quantity
- Temporary support pile driving
- φ711.2mm t=9mm / L=20.7~23.7m 30 pieces
- Steel pipe pile driving
- φ1,100mm t=11~19mm / L=68.124m 15 pieces
φ1,300mm t=13~25mm / L=66.300m 15 pieces
φ1,400mm t=14~22mm / L=68.572m 15 pieces
- Jacket installation
- 700 TF/unit 3 units