Taiwan Power Hsing-Ta Power Plant Offshore Unloading Pier and Link Bridge New Construction Project






Construction Overview
- Project name
- Taiwan Electric Power Co., Ltd. Xingda Power Station Outer Sea Wholesale Terminal and Connecting Pier New Construction Project
- Orderer
- Taiwan Power Company
Steel pipe pile driving work
- Connecting pier
- φ1,500mm L=46.0~55.0m / straight pile / 151 15.9° diagonal pile
- Coal unloading pier
- φ1,650mm L=65.0m / straight pile / 40 5.7° diagonal piles
φ1,200mm L=50.0m / 18 15.9° diagonal piles
φ1,200mm L=58.0~68.0m / Straight pile / 56 2.9° diagonal piles
φ1,500mm L=60.0~75.0m / Straight pile / 96 2.9°, 5.7°, 15.9° diagonal piles
φ1,100mm L=36~42m / 20 straight piles - Total
- 381 pieces
Other precast and steel girder installation