Yoshinogawa East Ring Large Bridge Substructure Section 4 Split Construction Work
Construction Overview
- Project name
- Yoshino River East Loop Bridge lower section 4th division construction work
- Client
- Tokushima Prefecture Prefectural Land Development Department Urban Road Development Bureau
Structure Specifications and Quantity
- Steel pipe sheet pile
- P6 / φ1,200mm t=14~25mm L=49.0m / 35 joint piles
P7 / φ1,200mm t=14~25mm L=49.5m / joint 35 piles
P8 / φ1,200mm t=14~25mm L=49.5m / 35 jointed piles
- Total
- 105 pieces