Construction Overview


Project name
Yoshino River East Loop Bridge lower section 5th division construction work

Client
Tokushima Prefecture Prefectural Land Development Department Urban Road Development Bureau

Structure Specifications and Quantity


Steel pipe sheet pile
P9 / φ1,200mm t14~25mm L=62.0m / 35 joint piles
P10 / φ1,200mm t14~25mm L=62.0m / 35 joint piles< br>P11 / φ1,200mm t14~25mm L=50.5m / 35 joint piles
Total 105