Yutaka No. 1

Crane Specifications

Crane Specifications Ship Specifications

Rated 1,710t (using 4 x 450t hooks) Specification status

Detailed Drawing of 1,710t Suspension

Pile Driving Leader Specifications

Pile Driving Leader Specifications Ship specifications

Grab Bucket Specifications

Grab Bucket Specifications Ship specifications








Main specifications
Hull Section
- Total length
- 106.0 m
- Width
- 43.0 m
- Depth
- 10.0 m
- Load capacity
- 16,000.0 ton
- Displacement
- 27,000.0 ton
- empty water
- 3.0 m
- Draft (laden)
- 6.8 m
Ship Handling Winch
- Pull load
- 60 t×8 units, 20 t×2 units
- Retrieval speed
- 60 t×10 m/min, 20 t×20 m/min
Side Thruster
- Forward side
- 900.0 ps
- Stern side
- 1,800.0 ps
Power Supply Equipment
- Main generator
- 2,200 kW×3 units
- Main generator engine
- 3,200 ps×3 units
- Auxiliary generator
- 240 kW×1 unit
- Auxiliary generator internal combustion engine
- 360 ps×1 unit
- Mobile generator for construction use
- 400 kW
Crane Specifications
- Maximum hoisting load
- 1,800.0 ton
- Hoisting speed
- 0~6.2 m/min
- Turning speed
- 0.3~0.8 rpm
- Working radius
- 28.0~80.0 m, 40.0~100.0 m (flying jib specification)
- Boom hoisting speed
- When lifting 1,800 t, R=40 m to 30 m, approximately 3 minutes without load
Pile Driving Leader Specifications
- Working radius
- 28.1 to 50.5 m (for straight piles)
- Maximum diameter
- 2,500 mm
- Pile inclination
- ±27°
- Turning speed
- 0.3~0.8 rpm
- Maximum weight
- 180 t (straight pile)
100 t (skew pile) - Hammer
- IHC S-500, S-280, S-200, S-90, S-70
Grab Bucket Specifications
- Maximum hoisting load
- 300 t
- Working radius
- 20~60.0 m
- Hoisting speed
- 40-75 m/min
- Unloading speed
- 55-75 m/min
- Maximum turning speed
- 0.8 rpm
- Nominal dredging capacity
- Light bucket 1,550 m3/hour
Ultra heavy bucket 460 m3/hour - Bucket capacity
- Light bucket 45 m3
Ultra heavy bucket 20 m3
Specifications
Crane Specifications
Pile Driving Leader Specifications
Grab Bucket Specifications
Construction results

Minami Honmoku -16mMC-3 Quay (Seismic Reinforcement) Construction Work

Tokyo International Airport Runway D External Construction Work

Cosmo Oil Sakaide Refinery No. 1 Pier Renovation Work

Taiwan Power Hsing-Ta Power Plant Offshore Unloading Pier and Link Bridge New Construction Project